  {"id":2059,"date":"2023-01-18T00:00:00","date_gmt":"2023-01-18T00:00:00","guid":{"rendered":"https:\/\/www.mtsu.edu\/blogtest\/spring-2023-campus-planning\/"},"modified":"2026-04-15T11:45:23","modified_gmt":"2026-04-15T16:45:23","slug":"spring-2023-campus-planning","status":"publish","type":"post","link":"https:\/\/www.mtsu.edu\/president\/spring-2023-campus-planning\/","title":{"rendered":"Spring 2023 Campus Planning"},"content":{"rendered":"<div style=\"margin-top: 0px; margin-bottom: 20px;\" class=\"sharethis-inline-share-buttons\" ><\/div><div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p>The physical landscape of the MTSU campus continues to evolve and grow in positive ways! Here are some key construction updates.<\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>SCHOOL OF CONCRETE AND CONSTRUCTION MANAGEMENT<\/strong><\/p>\n<p>Students began using MTSU\u2019s new $40.1 million School of Concrete and Construction Management (CCM) Building\u00a0on the west side of campus in October, as they prepare for professional careers in a high-demand sector throughout the booming Nashville area and beyond.<\/p>\n<p>Among the many features of the integrated and experiential learning laboratory are:<\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<ul>\n<li>\n<p>Four basic materials and building labs<\/p>\n<\/li>\n<li>\n<p>A dedicated mechanical, electrical, and\u00a0plumbing classroom<\/p>\n<\/li>\n<li>\n<p>A 200-seat lecture hall and a covered amphitheater<\/p>\n<\/li>\n<li>\n<p>A virtual design and construction lab capable of\u00a0advanced building models and construction simulations<\/p>\n<\/li>\n<li>\n<p>An augmented virtual reality lab<\/p>\n<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>Construction is a $1 trillion-plus industry that impacts every aspect of life\u2014where we live, work, learn, shop, dine, and more. Students graduating from the programs average $60,000-plus in starting salary and have an almost 100% placement rate.<\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p>I\u2019m amazed at the many ways concrete was utilized in the design and construction. Students will see firsthand how the many forms of concrete can add value and creativity\u00a0to a structure. The building is a true living laboratory, with examples of various construction techniques and operating systems operating in full view of students.<\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p>The 54,000-square-foot building is a major change for the 135 current Concrete Industry Management majors and 200 Construction Management students from their previous 9,000-square-foot Voorhies Engineering Technology space. Along with a neighboring Applied Engineering Building,\u00a0set for groundbreaking this spring (see below), the new facility marks an expansion of MTSU\u2019s Science Corridor of Innovation.<\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>KOM AND RUTLEDGE HALL RENOVATION<\/strong><\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p>Design has started for this project, and Anecdote is the designer of record. Design will continue through 2023\u00a0with construction set to begin in summer 2024. Kirksey<br \/>Old Main will house Mathematical Sciences, Computer Science, and Data Science. Rutledge will be converted\u00a0from a residential hall into an office\/classroom building to house University College\/University Studies. Renovations\u00a0to both structures will include major renovations of HVAC, plumbing, data\/IT, and electrical systems; replanning of building layouts to accommodate future use; accessibility improvements; window replacement; roofing; and other exterior building improvements. Small additions are also envisioned on both buildings to allow for new entries and vertical circulation.<strong> Demolition of the E.W. Midgett Building will be included in the scope of work.<\/strong><\/p>\n<p><strong>APPLIED ENGINEERING BUILDING<\/strong><\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p>The 89,000-square-foot Applied Engineering Building will serve as the home for the <strong>Engineering Technology and Mechatronics Engineering programs<\/strong> as well as provide space for future engineering programs. We are currently wrapping up construction drawings. The project includes demolition of Voorhies, infrastructure, site improvements, and surrounding pedestrian and vehicular circulation. HFR Inc. (Nashville) and Cooper Carry (Atlanta) are the designers for the project. <strong>Construction completion is anticipated in summer 2025<\/strong>.<\/p>\n<div class=\"page\" title=\"Page 4\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>CAPITAL MAINTENANCE<\/strong><\/p>\n<p>Multiple capital maintenance projects are ongoing across campus, including:<br \/>\u2022 Cope Administration Building reroof<br \/>\u2022 Campuswide utilities repair and replacement<br \/>\u2022 Elevator modernizations<\/p>\n<div class=\"page\" title=\"Page 5\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>TENNIS COMPLEX<\/strong><\/p>\n<p>Construction has started on our new on-campus tennis facility at the corner of Middle Tennessee Boulevard and Greenland Drive. The outdoor complex will include eight tennis courts, seating for 250 fans, new locker rooms, and new coaches\u2019 offices. Project completion is fall 2023.<\/p>\n<div class=\"page\" title=\"Page 5\">\n<div class=\"section\">\n<div class=\"layoutArea\">\n<div class=\"column\">\n<p><strong>STUDENT ATHLETE PERFORMANCE CENTER<\/strong><\/p>\n<p>Design continues for this project. Goodwyn Mills Cawood\u00a0is the designer of record for this project with HOK as a design consultant. Construction is set to begin this spring. The center will include new athletic offices, locker rooms, training areas, football operations space, and support spaces. The project scope also contains required site development, including parking improvements and site utilities. To facilitate the desired location of the building, we will be relocating the Murphy Center loading dock.<\/p>\n<p>A planned groundbreaking ceremony for the new center scheduled for Thursday, Jan. 19, was postponed in respect for alumnus and Trustee Joey Jacobs, who died on Saturday, Jan. 14. Jacobs was among the leaders of the Build Blue campaign, an ambitious effort announced in late 2021 to improve and modernize the University\u2019s athletics facilities.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The physical landscape of the MTSU campus continues to evolve and grow in positive ways! Here are some key construction updates. SCHOOL OF CONCRETE AND CONSTRUCTION MANAGEMENT Students began using MTSU\u2019s new $40.1 million School of Concrete and Construction Management (CCM) Building\u00a0on the west side of campus in October, as they prepare for professional careers [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":500,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2059","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts\/2059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/comments?post=2059"}],"version-history":[{"count":1,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts\/2059\/revisions"}],"predecessor-version":[{"id":3108,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/posts\/2059\/revisions\/3108"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/media\/500"}],"wp:attachment":[{"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/media?parent=2059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/categories?post=2059"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mtsu.edu\/president\/wp-json\/wp\/v2\/tags?post=2059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}